+919822007571 info@aace.com
Sr. No. | Name of the Project | Name of the client | Nature of work | ||
---|---|---|---|---|---|
Projects in Sugar Industries and Power Generation Plants | |||||
1 | Integrated Sugar Plant with 26MW Cogen. at SCM Sugars Ltd.,Koppa, Maddur, Dist Mandya, Karnataka |
Mitcon Consultancy & Engineering Services,Pune |
Design,Detail Engineering & Project Monitoring during execution of Electrical system of Integrated sugar plant with 26MW Cogeneration plant having power evacuation through 66KV switchyard. |
||
2 | Incidental Cogeneration project at Kisanveer Satara S.S.K.Ltd., Tal. Bhuinj, Dist Satara | Mitcon Consultancy & Engineering Services,Pune | Design,Detail Engineering & Project Monitoring during execution for Electrical system of 2 MW Incidental Cogeneration plant with power evacuation through 22KV switchyard. | ||
3 | Incidental Cogeneration project at Purna S.S.K.Ltd., Basmathnagar, Dist. Nanded | Mitcon Consultancy & Engineering Services, Pune | Design,Detail Engineering & Project Monitoring during execution for Electrical system of 1.5 MW Incidental Cogeneration plant with power evacuation through 22KV switchyard. | ||
4 | Incidental Cogeneration project at Kukadi S.S.K.Ltd., Tal.Shrigonda,Dist Ahmednagar | Mitcon Consultancy & Engineering Services, Pune | Design,Detail Engineering & Project Monitoring during execution for Electrical system of 2 MW Incidental Cogeneration plant with power evacuation through 33KV switchyard. | ||
5 | Incidental Cogeneration project at Sharad S.S.K.Ltd., Tal. Hatkanangane, Dist Kolhapur | Mitcon Consultancy & Engineering Services, Pune | Design,Detail Engineering & Project Monitoring during execution for Electrical system of 1.5 MW Incidental Cogeneration plant with power evacuation through 33KV switchyard. | ||
6 | Captive Power project for GMT Mining and Power Project, Nagpur | Mitcon Consultancy & Engineering Services, Pune | Design,Detail Engineering & Project Monitoring during execution for Electrical system of 12MW Biomass Based Power Plant with power evacuation through 132KV LILO switchyard | ||
7 | Cogeneration project for Gharda Chemicals Ltd. Chiplun Dist. Ratnagiri | Mitcon Consultancy & Engineering Services, Pune | Design,Detail Engineering & Project Monitoring during execution of Electrical Power Evacuation and Distribution system of 4MW Cogeneration plant including 33KV switchyard. | ||
8 | Cogeneration project for Krishna SSK Ltd. Karad Dist. Satara | Mitcon Consultancy & Engineering Services, Pune | Design,Detail Engineering & Project Monitoring during execution Electrical Power Evacuation and Distribution system of 16MW Cogeneration plant with power evacuation through 110-132KV switchyard. | ||
9 | MSETCL installation for Cogeneration project at Krishna SSK Ltd.Karad Dist. Satara | Mitcon Consultancy & Engineering Services, Pune | Design,Detail Engineering & Project Monitoring during execution of Electrical Installation in MSETCL scope including substation bay at Karkhana, 132KV Transmission Line and bay at Rethare MSETCL 110-132KV switchyard. | ||
10 | Cogeneration project for Yash Agro Energy Pvt. Ltd. Dist. Chandrapur | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution for Electrical system of 8MW Cogeneration plant with power evacuation through 33KV switchyard. | ||
11 | Cogeneration project at Mula Sahakari Sakhar Karkhana Ltd. Dist. Ahemadnagar | Mitcon Consultancy & Engineering Services, Pune | Design,Detail Engineering & Project Monitoring during execution for Electrical system of 16MW Cogeneration plant with power evacuation through 33KV switchyard. | ||
12 | Captive Power project at Hospet Ispat Ltd. Dist. Hospet | Mitcon Consultancy & Engineering Services, Pune | Design and Detail Engineering for Electrical system of 12MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
13 | Biomass Based Power project at Armstrong Energy Pvt. Ltd.,Nasik | Mitcon Consultancy & Engineering Services, Pune | Design,Detail Engineering & Project Monitoring during execution for Electrical system of 6MW CPP with power evacuation through 33KV switchyard. | ||
14 | Cogeneration project at Loknete B.P.Patil SSK Ltd.Tal.Mohol, Dist.Solapur | Mitcon Consultancy & Engineering Services, Pune | Design and Detail Engineering for Electrical system of 8MW Cogeneration plant with power evacuation through 33KV switchyard. | ||
15 | Cogeneration project at Kisanveer Satara SSK Ltd. Bhuinj,Satara | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 22MW Cogeneration plant with 132KV switchyard. | ||
16 | MSETCL installation for Cogeneration project at Kisanveer Satara SSK Ltd. Bhuinj,Dist. Satara | Mitcon Consultancy & Engineering Services, Pune | Design,Detail Engineering & Project Monitoring during execution of Electrical Installation in MSETCL scope including substation bay at Karkhana, 132KV Transmission Line and LILO bays at Plant End Switchyard | ||
17 | Sugar Plant Modernisation project for Urjankur Trust of IL & FS at Shri Datta SSK Ltd.Shirol,Kolhapur | Mitcon Consultancy & Engineering Services, Pune | Design,Detail Engineering & Project Monitoring during execution for Electrical system including 11KV Power Distribution for Fibrizer, Mill Drives and Transformers | ||
18 | Sugar Plant Modernisation project for Urjankur Trust of IL & FS at Warna SSK Ltd. Warna nagar, Kolhapur | Mitcon Consultancy & Engineering Services, Pune | Design & Detail Engineering for Electrical system including 11KV Power Distribution for Fibrizer, Mill Drives and Transformers | ||
19 | Cogeneration project at Shri Shankar SSK Ltd. Sadashiv nagar Dist. Solapur | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 20MW Cogeneration plant with 132KV switchyard. | ||
20 | Sugar Plant Modernisation project at Shri Shankar SSK Ltd. Sadashiv nagar Dist. Solapur | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution for Electrical system including 11KV Power Distribution for Fibrizer, Mill Drives and Transformers | ||
21 | Cogeneration project at Purna SSK Ltd. Basmath nagar Dist. Hingoli | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 18MW Cogeneration plant with 132KV switchyard. | ||
22 | MSETCL installation for Cogeneration project at Purna SSK Ltd. Basmathnagar, Dist. Parbhani | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Installation in MSETCL scope including substation bay at Karkhana, 132KV Transmission Line and bay at MSETCL Basmathnagar 132KV Switchyard | ||
23 | Cogeneration project Ph. I at Kranti SSK Ltd. Kundal Dist. Sangli | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 8MW Cogeneration plant with 33KV switchyard. | ||
24 | Sugar Plant Power Distribution System at Kranti SSK Ltd. Kundal Dist. Sangli | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution for Electrical system including 11KV Power Distribution for sugar plant | ||
25 | Captive Power project at Abelon Clean Energy Ltd. Ahemadabad | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 9.9 MW Captive Power plant with 66KV switchyard. | ||
26 | Cogeneration project Ph. II at Kranti SSK Ltd. Kundal Dist. Sangli | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 9MW Cogeneration plant | ||
27 | Captive Power project for Greta Energy Ltd., Brahmapuri,Dist. Chandrapur | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 15MW Captive Power plant with 132 KV switchyard. | ||
28 | Integrated Sugar , Ethanol and Cogeneration project at Sugauli in Bihar for HPCL | Mitcon Consultancy & Engineering Services, Pune | Design & Detail Engineering of Electrical Evacuation and Power Distribution system of Sugar Plant, Ethanol Plant and 20 MW Cogeneration plant with 132KV switchyard. | ||
29 | Integrated Sugar , Ethanol and Cogeneration project at Lauria in Bihar for HPCL | Mitcon Consultancy & Engineering Services, Pune | Design & Detail Engineering of Electrical Evacuation and Power Distribution system of Sugar Plant, Ethanol Plant and 20 MW Cogeneration plant with 132KV switchyard. | ||
30 | Captive Power project for Sathyam Power Project Ltd., Merta, Rajasthan | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 10MW Captive Power plant with 33 KV switchyard. | ||
31 | Cogeneration project at Shri Doodhganga Vedganga SSK Ltd. Bidri Dist. Kolhapur | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 20MW Cogeneration plant with 110 - 132KV switchyard. | ||
32 | Cogeneration project at Ashok SSKL, Tal Shrirampur, Dist. Ahmednagar | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 15MW Cogeneration plant with 132KV switchyard. | ||
33 | Sugar Plant Modernisation project at Shri Doodhganga Vedganga SSK Ltd. Bidri Dist. Kolhapur | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution for Electrical system including 11KV Power Distribution for Fibrizer, Mill Drives and Transformers | ||
34 | Cogeneration project at Mahatma Sugar & Power Ltd., Dist. Wardha | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 15MW Cogeneration plant with 132KV switchyard. | ||
35 | MSETCL installation for Cogeneration project at Mahatma Sugar & Power Ltd. Dist. Wardha | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Installation in MSETCL scope including substation bay at Karkhana, 132KV Transmission Line and bay at Selu 132 KV Switchyard | ||
36 | Integrated 7000 TCD Sugar Plant & 30MW Cogen. project at Shri Bhausaheb Thorat SSKL, Sangamner, Dist. Ahemadnagar | Mitcon Consultancy & Engineering Services, Pune | Design & Detail Engineering of Electrical Evacuation and Power Distribution system of Sugar Plant and 30 MW Cogeneration plant with 132KV switchyard. | ||
37 | Cogeneration project at Urjankur Shri Datta Power Company Ltd. | Urjankur Shree Datta Power Company Ltd., ILFS, Mumbai | Design & Detail Engineering of Electrical Evacuation system with 33KV switchyard. | ||
38 | Cogeneration Power project at Usher Agro Ltd., Mathura U. P. | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical system for 1 MW Cogeneration plant with power distribution system. | ||
39 | Captive Power project at Usher Eco Power Ltd. Chhapra U. P. | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 16 MW Power plant with 132KV switchyard. | ||
40 | Cogeneration Power project at Parag Milk and Milk Products, Manchar, Dist. Pune | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical system for 2 MW Cogeneration plant with power distribution system. | ||
41 | Cogeneration Power project at Athani Farmers Sugar Factory Ltd., athani, Karnataka | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 24MW Cogeneration plant with 110KV switchyard. | ||
42 | Cogeneration Power project at 12 Nos. Sugar Factories in Tamil nadu for TNEB | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 7/12 /15 /18 MW Cogeneration plant with 110KV switchyard. | ||
43 | Vriddheshwar S.S.K.. Ltd. Adinathnagar Pathardi, Dist- Nagar. | Prerana Enterprises, Pune (for NHEC ) | Design, Detail Engineering & Project Monitoring during execution of Electrical installation for 2500 TCD sugar plant | ||
44 | Ajara S.S.K.. Ltd. Dist. Kolhapur. | Prerana Enterprises, Pune (for NHEC ) | Design, Detail Engineering & Project Monitoring during execution of Electrical installation for 2500 TCD sugar plant | ||
45 | Jath Taluka S.S.S.K..Ltd. Dist. Sangli. | Prerana Enterprises, Pune (for NHEC ) | Design, Detail Engineering & Project Monitoring during execution of Electrical installation for 2500 TCD sugar plant | ||
46 | Shree Mahalaxmi Sugars Ltd. Nepal | Prerana Enterprises, Pune(for NHEC ) | Design, Detail Engineering & Project Monitoring during execution of Electrical installation for 2000 TCD sugar plant | ||
47 | Pandavpura S.S.K. Ltd. Dist. Mysore | Prerana Enterprises, Pune (for NHEC ) | Design, Detail Engineering & Project Monitoring during execution of Electrical installation for 2500 TCD sugar plant | ||
48 | Shree Pandurang S.S.K. Ltd. Akluj, Dist. Solapur | Prerana Enterprises, Pune (for NHEC ) | Design, Detail Engineering & Project Monitoring during execution of Electrical installation for 2500 TCD sugar plant | ||
49 | 2x1MW power project at Kanoria Chemicals Ltd. Ankaleshwar, Gujrat | Cogen India Engineering Pvt. Ltd. Pune | Technical support in erection and comm. of Biogas based power plant with 2 Nos. 1MW Gas Engines | ||
50 | 3x1MW power project at Rithala near Delhi | Cogen India Engineering Pvt. Ltd. Pune | Design and detail engineering of Biogas based power plant with 3 Nos. 1MW Gas Engines | ||
51 | 2x1.94 MW power project at Citurgia Biochemicals Ltd. Surat | Cogen India Engineering Pvt. Ltd. Pune | Design, Detail Engineering & Project Monitoring during execution of Natural gas based power plant with 2 Nos. 1.94MW Gas Engines | ||
52 | 4MW Cogeneration project in Sugar Plant at Halgaon, Tal. Jamkhed, Dist. Ahemad nagar | Jaishriram Sugar & Agro Products Ltd., Pune | Design and Detail Engineering of Electrical Evacuation and Power Distribution system of 4MW Power plant with 33KV switchyard. | ||
53 | Electrical Installation of STG Power Plant Building in Sudan Project | Arvee Electricals & Engineers Pvt. Ltd., for Uttam Industries Ltd. | Design and Detail Engineering of Electrical System of Power plant. | ||
54 | Power Distribution System in Distillery at Purti Power & Sugar Ltd., Tal. Umred, Dist. Nagpur | Purti Power & Sugar Ltd., Tal. Umred, Dist. Nagpur | Design and Detail Engineering of Electrical Power Distribution system | ||
55 | Sugar Plant Modification project at Mahatma Sugar & Power Ltd., Dist. Wardha | Mahatma Sugar & Power Ltd., Dist. Wardha | Design, Detail Engineering & Project Monitoring during execution for Power Distribution system including provision of MCCs, DBs etc. | ||
56 | Sugar Plant Modification project at Wainganga Sugar & Power Ltd., Dist. Bhandara | Wainganga Sugar & Power Ltd., Dist. Bhandara | Design, Detail Engineering & Project Monitoring during execution for Power Distribution system including provision of MCCs, DBs etc. | ||
57 | Modification in Existing Electrical System at Kramtiagrani Dr. G.D.Bapu Lad SSKL, Kundal, Dist. Sangli | Kramtiagrani Dr. G.D.Bapu Lad SSKL, Kundal, Dist. Sangli | Design, Detail Engineering & Project Monitoring for Modification in Existing Electrical Installation for export of 10MW Power to MSEDCL Grid | ||
58 | 5MW Incineration Power project & Power Distribution in Distillery at Balrampur Chini Mills, Balrampur, U.P. | Balrampur Chini Mills, Balrampur, U.P. | Design and Detail Engineering of 5MW Incineration Power Plant and Power Distribution system in Distillery | ||
59 | Relay Coordination Study in 22MW Cogeneration Power Plant at Kisanveer Satara SSKL, Bhuinj, Dist. Satara | Kisanveer Satara SSKL, Bhuinj, Dist. Satara | Relay Coordination & Protection Study in Electrical System of 22MW Cogen Power Plant | ||
60 | Integrated 10000 TCD Sugar Plant & 51MW (35+16MW) Cogen. Power project at Shri Sai Priya SSKL, Tal. Jamkhandi, Dist. Bijapur, Karnataka | Om Associates, Belgaum, Karnatak | Design & Detail Engineering of Electrical Evacuation and Power Distribution system of Sugar Plant and 51 MW (35+16MW) Cogeneration plant with 110KV switchyard. | ||
61 | Electrical System Study & Harmonic Analysis of 8000 TCD Sugar Plant & 37.4MW (22.4+15MW) Cogen. Power Project at Vishwaraj Sugar Industries Ltd., Ta. Hukkeri, Dist. Belgaum, Karnatak | Vishwaraj Sugar Industries Ltd., Ta. Hukkeri, Dist. Belgaum, Karnatak | Detaile System Study, Harmonic Analysis, Relay Coordination & Protection Study in Electrical System of 22MW Cogen Power Plant | ||
62 | Cogeneration Power Plant at Shri Vittal SSK Ltd., Gursale, Tal. Pandharpur, Dist. Solapur | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 20MW Cogeneration plant with 220KV LILO switchyard. | ||
63 | Cogeneration Power Plant at Sahakar Shiromani Vasantro Kale SSK Ltd., Bhalwani, Tal. Pandharpur, Dist. Solapur | Mitcon Consultancy & Engineering Services, Pune | Design, Detail Engineering & Project Monitoring during execution of Electrical Evacuation and Power Distribution system of 18MW (10+8MW) Cogeneration plant with 220KV switchyard. | ||
64 | Sugar Refinary at Jawamanis Rafinasi LLB., Indonesia | Spencer Sytems, Pune | Design, Detail Engineering & Project Monitoring of Electrical Power Distribution system including replacement of MCCs, DBs & interconnection with Plant SCADA | ||
65 | 6MW DG set Synchronizing, Load Sharing & Power Management System at Zuari Agro Chemicals Ltd., Goa | Spencer Sytems, Pune | Design, Detail Engineering & Project Monitoring of Grid synchronizing, Load Sharing, Load Shedding & Power Management System with PLC for existing 6MW Duel Fuel (LDO + HSD) DG set | ||
66 | 5MW Solar Power Plant for Visa Ecotech Ltd. at Mograle, Tal. Phaltan, Dist. Satara | Spencer Sytems, Pune | Design, Detail Engineering & Project Monitoring of AC Distribution & Power Evacuation System with 132KV LILO Switchyard | ||
Basic Engineering & Detail Project Report Assignments | |||||
67 | Integrated Sugar Plant with 24 MW Cogen. at Davangere Sugars Ltd., Karnataka | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of Integrated sugar plant with 24MW Cogeneration plant having power evacuation through 66KV switchyard. | ||
68 | Cogeneration project at Kukadi S.S.K.Ltd., Tal. Shrigonda , Dist Nagar | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering and project report for Electrical system of 9 MW Cogeneration plant with power evacuation through 33KV switchyard. | ||
69 | DPR for Cogeneration project for Karthik Rukmini Alloys Pvt. Ltd. Dist. Adilabad, A.P. | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 25MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
70 | Incidental Cogeneration project at Ashok S.S.K.Ltd., Ashoknagar, Tal. Shrirampur , Dist. A. Nagar | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering and Preparation of detail project report for Electrical system of 1.5 MW Incidental Cogeneration plant with power evacuation through 33KV switchyard. | ||
71 | Incidental Cogeneration project at Shri. Vitthal S.S.K.Ltd., Pandharpur , Dist. Solapur | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering and Preparation of detail project report for Electrical system of 1.5 MW Incidental Cogeneration plant with power evacuation through 33KV switchyard. | ||
72 | Cogeneration project at Sangamner Bhag S.S.K. Ltd., Dist Nagar | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering and project report for Electrical system of 7 MW Cogeneration plant with power evacuation through 33KV switchyard. | ||
73 | Cogeneration project at Sangamner Bhag S.S.K. Ltd., Dist Nagar | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering and project report for Electrical system of 24 MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
74 | Cogeneration project for Diwan Sugars Ltd. Moradabad | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 24MW Cogeneration plant with power evacuation through 110KV switchyard. | ||
75 | DPR for Biomass Based Power project in Washim District for Turboatom TPS Ltd. Delhi | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 24MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
76 | DPR for Biomass Based Power project in Wardha District for Turboatom TPS Ltd. Delhi | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 20 MW Biomass Based Power plant with power evacuation through 132KV switchyard. | ||
77 | DPR for Cogeneration project for Chinatmani Agro Products Ltd. Dist. Yeotmal | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 24MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
78 | Techno Economic Feasibility Report for 24MW Cogeneration project for Kirloskar Consultants Ltd. | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering and project report for Electrical system of 24MW Cogeneration plant with integrated sugar Plant and power evacuation through 110KV switchyard. | ||
79 | DPR for Cogeneration project for Piccadily Agro Industries Ltd. Dist. Karnal, Haryana | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering and project report for Electrical system of 12MW Cogeneration plant with power evacuation through 110KV switchyard. | ||
80 | DPR for Cogeneration project for PDVP SSK Ltd., Pravaranagar, Tal. Shrirampur Dist. Ahmednagar | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering and project report for Electrical system of 16MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
81 | DPR for Cogeneration project for Gharda Chemicals Ltd. Chiplun Dist. Ratnagiri | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 4MW Cogeneration plant with power evacuation through 33KV switchyard. | ||
82 | Detailed Project Report for Cogeneration project for Krishna SSK Ltd. Karad Dist. Satara | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering and project report for Electrical system of 16 MW Cogeneration plant with power evacuation through 33KV switchyard. | ||
83 | DPR for Cogeneration project for Gayatri Energy Pvt. Ltd. Dist. Aurangabad | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering and project report for Electrical system of 7MW Cogeneration plant with power evacuation through 33KV switchyard. | ||
84 | DPR for Cogeneration project for Yash Agro Energy Pvt. Ltd. Dist. Chandrapur | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering and project report for Electrical system of 8MW Cogeneration plant with power evacuation through 33KV switchyard. | ||
85 | DPR for Cogeneration Power project for SPL Technologies Ltd. Mumbai | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 20MW Cogeneration plant at Bhandara with power evacuation through 132KV switchyard. | ||
86 | Cogeneration project at Nagar Taluka S.S.K.Ltd.,Walki, Dist Ahmednagar | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering of Electrical system for power evacuation with 33KV switchyard. | ||
87 | DPR for Cogeneration Power project for Kisanveer Satara SSK Ltd. Bhuinj, Satara | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 10MW + 3 MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
88 | DPR for Cogeneration Power project for Urjankur Trust of IL & FS at Kisanveer Satara SSK Ltd. Bhuinj, Satara | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 20 MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
89 | DPR for Cogeneration Power project at Kisanveer Satara SSK Ltd. Bhuinj, Satara | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 22 MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
90 | DPR for Captive Power project for Shri. Mahavir Ferro Alloys Ltd. Raurkela | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 20MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
91 | Captive Power project for BLA Power Projects, Mumbai | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 2 x 260 MW Coal Based Power Plant with power evacuation through 220 KV Switchyard | ||
92 | DPR for Cogeneration Power project at Purna SSK Ltd. Basmath nagar Dist. Hingoli | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 18 MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
93 | 4 MW Cogeneration project at Pannageshwar Sugar Mill, Renapur, Dist. Latur | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering Electrical system of 4MW Cogeneration plant with power evacuation through 33KV switchyard. | ||
94 | DPR for Cogeneration Power project at Shri Shankar SSK Ltd. Sadashiv nagar Dist. Solapur | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 20 MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
95 | Cogeneration project at Bhoramdeo S.S.K.U. Ltd., Chattisgarh. | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering and project report for Electrical system of 24 MW Cogeneration plant with power evacuation through 33KV switchyard. | ||
96 | DPR for Cogeneration, Power and Ethenol project at Kadepur | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering and project report for Electrical system of 27.5MW Cogeneration plant with power evacuation through 110KV switchyard. | ||
97 | DPR for Cogeneration Power project at Saikrupa Sakhar Karkhana Ltd. Dist. Ahemadnagar | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 3MW Cogeneration plant with power evacuation through 33KV switchyard. | ||
98 | DPR for Cogeneration Power project at Nath Pulp Ltd., Paithan, Dist. Aurangabad | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 10MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
99 | Technical Feasibility Report for Captive Power project at Steel Exchange Industries Ltd., Vaizag | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 60MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
100 | Cogeneration Power project at Panchaganga SSK Ltd., Ichalkaranji, Dist. Kolhapur for Sri Renuka Energy Ltd. | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 30 MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
101 | Detailed Project Report for Cogeneration Power project at Ajinkyatara SSK Ltd., Dist. Satara for Sri Renuka Energy Ltd. | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 20 MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
102 | Detailed Project Report for Cogeneration Power project at Shri Malaprabha SSK Ltd., Dist. MK Hubli, Karnataka | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 20 MW Cogeneration plant with power evacuation through 110KV switchyard. | ||
103 | DPR for Cogeneration Power project at Shri Doodhganga Vedganga SSK Ltd. Bidri Dist. Kolhapur | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 20 MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
104 | Detailed Project Report for Cogeneration Power projects at 17 Nos Sugar Factories in Tamil nadu for TNEB | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 7 / 12 /15 /18 MW Cogeneration power plants with power evacuation through 110KV switchyard. | ||
105 | Captive Power project at Tata Power Company Ltd., Kadav Near Bhivpuri | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 1MW CPP with power evacuation through 22KV switchyard. | ||
106 | Gas based power projects | Cogen India Engineering Pvt. Ltd. Pune | Technical support in prebid engineering for the enquiries, tenders and discussions with prospective clients. | ||
107 | Balance of Plant - Electrical for 10MW Biomass based CPP for GEI Power Ltd., Chhatisgad | Areva T & D Ltd. | Basic Engineering for Electrical system of 10MW CPP with power evacuation through 33KV switchyard. | ||
108 | Basic Engineering Document for 22MW Cogeneration Power project at Sukari Industries Ltd. Ndhiwa, Kenya | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for Electrical system of 22 MW Cogeneration plant with power evacuation through 132KV switchyard. | ||
109 | Basic Engineering Document for 18MW HFO based Grid Connected Power Generation project for Govt. of Comores at Moroni in East Africa | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering Document for 18MW Heavy Fuel Oil base load Grid Connected Power Generation plant with tank farm & Power Evacuation at 20KV system. | ||
110 | Integrated Sugar Plant with 30 MW Cogen. Ph. II at Davangere Sugars Ltd., Karnataka | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for 66KV switchyard extension. | ||
111 | Grid Interactive 20MW (AC) Solar PV Power Plant at Trivent Ltd., Budhani, M. P. | Mitcon Consultancy & Engineering Services, Pune | Basic Engineering for 20MW SPV Power Plant | ||
112 | 100TPH, 67Kg/Sq. Cm Boiler & 10MW Power Plant at Shree Chalthan Sugars Ltd. Gujrat | Privileg Biksons Boilers Pvt., Ltd., Pune | Design, Detail Engineering & Technical Consultancy Services in Electrical System of 100TPH, 67Kg/Sq. Cm Boiler & 10MW Power Plant & Power Distribution | ||
113 | 22TPH, Incineration Boiler & 2MW Power Plant at Shree Gurudatta Sugars Ltd., Dist. Sangli | Privileg Biksons Boilers Pvt., Ltd., Pune | Design, Detail Engineering & Technical Consultancy Services in Instrumentation & DCS System of 22TPH, Spent Wash & Coal Fired Boiler, Coal Handling, Ash Handling System & 2MW Power Plant | ||
114 | 22TPH, Incineration Boiler & 2MW Power Plant at Shree Gurudatta Sugars Ltd., Dist. Sangli | Privileg Biksons Boilers Pvt., Ltd., Pune | Design, Detail Engineering & Technical Consultancy Services in Instrumentation & DCS System of 22TPH, Spent Wash & Coal Fired Boiler, Coal Handling, Ash Handling System & 2MW Power Plant | ||
115 | Balance of Plant Electrical for 6000 TPD Sugar Expansion Project for Dangote Sugar Refinery LLC, Nigeria | Siemens Ltd., Mumbai | Design & Detail Engineering Services in Electrical System of 6000TPD Sugar Expansion Project | ||
116 | Relay co-ordination | Shri Gurudatta Sugars Ltd. | Relay co-ordination and tripping problem troubleshooting | ||
117 | Sugar plant modernization | YM Krishna SSKL | Electrical power distribution in sugar plant modernization project | ||
118 | Mula SSKL- 2MW EPC project with 22 TPH spent wash incineration boiler | Privilege Biksons Boilers Pvt. Ltd. | Design and detailed engineering including tender study,feeder list, preparation of specifications for major electrical equipments, lighting, earthing and cable engineering, layouts, inspection for transformers, panels etc for 2MW EPC project with 22 TPH spent wash incineration boiler | ||
119 | Samartha SSKL - 22 TPH Spent wash + coal/bagasse fired incineration boiler | Privilege Biksons Boilers Pvt. Ltd. | Design and detailed engineering including tender study,feeder list, preparation of specifications for major electrical equipments, lighting, earthing and cable engineering, layouts, inspection for transformers, panels etc for 2MW EPC project with 22 TPH spent wash incineration boiler | ||
120 | Yedeshwari SSKL -70 TPH bagasse fired boiler | Privilege Biksons Boilers Pvt. Ltd. | Design and detailed engineering including tender study,feeder list, preparation of specifications for major electrical equipments, lighting, earthing and cable engineering, layouts, inspection for transformers, panels etc for 2MW EPC project with 70 TPH bagasse fired boiler | ||
121 | Samartha Sagar SSKL -22 TPH Spent wash + coal/bagasse fired incineration boiler | Privilege Biksons Boilers Pvt. Ltd. | Design and detailed engineering including tender study,feeder list, preparation of specifications for major electrical equipments, lighting, earthing and cable engineering, layouts, inspection for transformers, panels etc for 2MW EPC project with 22 TPH bagasse fired boiler | ||
122 | Daund Sugars Ltd.-2MW EPC project with 22 TPH spent wash incineration boiler | Privilege Biksons Boilers Pvt. Ltd. | Design and detailed engineering including tender study,feeder list, preparation of specifications for major electrical equipments, lighting, earthing and cable engineering, layouts, inspection for transformers, panels etc for 3MW EPC project with 30 TPH spent wash incineration boiler |