LIST OF INDUSTRIAL PROJECTS COMPLETED BY AAMI ASSOCIATE CONSULTING ENGINEERS

Sr. No. Name of the Project Name of the client Nature of work
1 Hydraulic Presses at Bharat Forge Ltd. Satara. Prerana Enterprises, Pune Design of control panels for 160T and 100T hydraulic presses.
2 J.B.M. Tools Ltd. Bhosari, Pune Prerana Enterprises, Pune Replacement of contrpl Panels for 4 Nos.600T press and 1No.1500T press.
3 Kalyani Brakes Ltd. Chakan Prerana Enterprises, Pune Design of Power Distribution Boards and PCCs.
4 Cummins India Ltd. Pune Prerana Enterprises, Pune Replacement of old panels for Grinding machines & SPMS with PLCs.
5 Mahindra Ugine Steels Ltd. Kanhe, Dist. Pune. Prerana Enterprises, Pune Commissioning of electrical system for 2 Nos. 500T presses.
6 Foundry unit of m/s Shankeshwar Alloys Ltd. at Chakan. Prerana Enterprises, Pune Design of electrical distribution system.
7 New Plant at Chakan J.B.M. Tools Ltd. Chakan Dist. Pune Technical support in erection and comm. of imported presses with following capacities, 600T -2Nos. 800T- 2Nos & 1500T-1No./td>
8 Foundry with 750KW induction furnace and allied work. Samartha Metals (I) Pvt. Ltd. Satara Design, Detail Engineering & Project Monitoring during execution for 22KV switchyard, distribution system and Power Distribution incuding illumination.
9 Heavy Fabrication shop at Chakan Metalex Process Equipments (I) Pvt. Ltd. Chakan Design, Detail Engineering & Project Monitoring during execution for 22KV switchyard, distribution system and illumination.
10 Core plug fitting SPMs for TELCO, Pimpri, Pune Synergetic Sales and Services (Pvt.) Ltd. Pune Design & Engineering for PLC based control panel to suit functional requirements of SPM
11 Multi spindle nut runners for TELCO, Pimpri, Pune Synergetic Sales and Services (Pvt.) Ltd. Pune Design & Engineering for control panel to suit functional requirements of measuring systems imported from AMT Germany.
12 Power Distribution in Auto Ancillery Plant at Sanaswadi, near Pune Walker Exhaust India Pvt. Ltd. Pune Design, Detail Engineering & Project Monitoring during execution for 22KV switchyard,D.G. sets, distribution system and illumination.
13 Bharat Forge Ltd. Pune. Wheel Rim Project at Chakan. Dist. Pune Design, Detail Engineering & Project Monitoring during execution of 33KV switchyards, LT. Installation, earthing & lightning protn.
14 Marpol Chemical (P) Ltd. Goa. Powder coating plant at Kakoda Goa Design, Detail Engineering & Project Monitoring during execution of Electrical installation with H.T. Switchyard, D-G set including AMF, lightning protection & illumination.
15 Patheja Forging and auto parts manu- facturing Ltd. Pune. Machine shop, Phase III at Chakan near Pune Design, Detail Engineering & Project Monitoring during execution of 22 KV switchyard sub- stn, Distribution system, Illumination
16 Hotel Centaur Juhu, Mumbai Efforts engineers Pvt. Ltd. Pune Reconditioning of electrical system for Centrifugal Air Conditioning plants of 600TR and 300TR capacities.
17 Coal Handling and Baggasse Handling Plants A.G. Engineering services, Pune Design of control panels required for CHP and BHP for various clients.
18 Rehabilitation of earth quake at Killari. Govt.of Maharashtra. Electrical distribution at Killari, Nai Chakur & Kanegaon Village.
19 Drama Theatre at Kothrud. Pune. (Yashwantrao Chavan Natyagruha) PMC Pune. Design, Detail Engineering & Project Monitoring during execution of Electrical distribution, specialised lighting in theatre etc.
20 Effluent treatment plant at old Air Port, Santacruz, Mumbai Air India, Mumbai Detail Engg. Of Effluent treatment plant and illumination system.
21 Particle Board manufacturing plant at mysore. Bison India Ltd. Bhosari, Pune Renovation and upgradation of electrical system for particle board plant.
22 Particle Board manufacturing plant from sugar cane baggasse Daulat S.S.K. Ltd. Tal. Chandgad, Dist.Kolhapur Detail Engg. & design of electrical distribution system, Deign of control and Instrumentation system to suit process requirements from m/s BISON Werke of Germany.
23 Particle Board manufacturing plant from sugar cane baggasse Satpuda Tapi Parisar S.S.K.Ltd. Shahada, Dist. Dhule Detail Engg. & design of electrical distribution system, Deign of control and Instrumentation system to suit process requirements from m/s BISON Werke of Germany.
24 Spinning mill at Hupri for m/s.Vyankatesh Shetakari Sah. Soot Girni, Ichalkarangi. Prerana Enterprises Pune Design and Detail Engg. of Electrical installation for soot girni including 22KV switchyard and sub stn.
25 Precast slabs Intelegent Building Systems Pvt. Ltd. Talegaon MIDC IBSPL, Pune Design and Detail Engg. of Electrical installation including 22KV switchyard and Power Distribution
26 Power Distribution Projects in WESCO at Bolangir, Sanepur, Raurkela & Sambalpur Arvee Electrical & Engineers Pvt. Ltd., Pune Project Monitoring Services in Power Distribution Projects in WESCO at Bolangir, Sanepur, Raurkela & Sambalpur
27 TETP Project for Jindal Steel & Power Ltd., A/c VA Tech Wabag Arvee Electrical & Engineers Pvt. Ltd., Pune Design and Detail Engg. of Electrical installation
28 Power Distribution in Auto Ancillery Plant at Talegaon MIDC, Dist.Pune Sintercom India Pvt. Ltd., Pune Design, Detail Engineering & Project Monitoring during execution for 22KV switchyard,D.G. sets, distribution system and illumination.