LIST OF TECHNICAL AUDITS COMPLETED BY AAMI ASSOCIATE CONSULTING ENGINEERS

Sr. No. Name of the Project Name of the client Nature of work
  Energy Audits
1 Energy Audit at DGP Hinoday Ltd. Bhosari, Pune Kirloskar Metglass Pvt. Ltd. Ltd. Pune Energy Audit of Furnaces and ball mills.
2 Kirloskar Oil Engines Ltd. Pune. Energy Audit in Machine Shop Energy Audit of electrical distribution in machine shops, drives, illumination systems etc.
3 Kirloskar Electric Co. Ltd. Bangalore Energy Audit Energy Audit of drives , welding equipments , ovens etc.
4 Energy Audit at Educational Campus of Vidya Pratishthan in Baramati Vidya Pratishthan, Baramati, Dist. Pune Energy Audit of Electrical system with Switchyard and electrical distribution and Illumination
5 MSRTC Bombay Energy Audit in Central Workshop at Dapodi, Pune Energy Audit of electrical distribution, machine shops, illumination systems etc.
6 Energy Audit at Bibani Industries Cochin. Kirloskar Consultants Ltd. Pune Energy Audit of electrical system in Cell house and electrical distribution at Binani Industries Ltd. Cochin.
7 Energy Audit at Amforge Industries Ltd. Chinchwad, Pune Mitcon Consultancy Services, Pune Energy Audit of Electrical system with Induction furnaces, Switchyard and electrical distribution.
  Electrical Safety Audits
1 Hindalco, Silvasa Rathi Industrial Engineering Co. Ltd. Pune Technical support in obtaining TAC appoval for Fire Hydrant System
2 Safety Audit of electrical installation at Cipla Ltd. Kurkumb Dist. Pune Cipla Ltd. Kurkumbh, Dist. Pune Safety Audit of electrical system including 33KV switchyards, substn and distribution system in Product Buildings, Utility areas including tank farm.
3 Safety Audit of Electrical Installation at National Bank for Agriculture Bank Rural Development (NABARD) Mitcon Consultancy Services, Pune Safety Audit of electrical system including 11KV switchyards, substn DG set and distribution system in Main admin. Building at Shivajinagar, Pune
4 Safety Audit of electrical installation at Cipla Ltd. MIDC Patalganga Cipla Ltd. Patalganga Dist. Raigad Safety Audit of electrical system including 22KV switchyards, substn and distribution system in Product Buildings, Utility areas including tank farm.
5 Electrical Safety Audit at Plot 09 & Plot 10 at Cipla Indore SEZ, Dist Dhar, M. P. Cipla Ltd. Indore Safety Audit of electrical system including 33KV switchyards, substn and Electrical distribution system including Flameproof Installation
6 Electrical Installation Safety Audit for Plot A-2 at Cipla Ltd. MIDC Patalganga Cipla Ltd. Patalganga Dist. Raigad Safety Audit of electrical system including 22KV switchyards, Transformer Sub Staion, Plant Porduction Buildings, Utility Areas, API Plant installation including Flameproof Electrical System
7 Safety Audit of electrical installation of Amanora Park Township, Hadapsar for Citi Corporation, Pune Mitcon Consultancy Services, Pune Safety Audit of electrical system including 2 Nos. 22KV switchyards, substn and distribution system of 24 storied towers & Utility Buildings in township
8 Technical Audit for Electrical Installation of 110KV Switchyard, Sub station & Manufacturing Units I to X devided in 3 campus at Cipla Ltd, Verna Goa Cipla Ltd. Patalganga Dist. Raigad Technical Audit for Electrical Installation of 110KV Switchyard, Sub station & Manufacturing Units I to X in 3 campus at Cipla Ltd, Verna Goa
9 Technical Audit of Electrical Installation of 5000 TCD Sugar Factory, 33MW Cogeneration Power Plant with 132KV Switchyard Superior Food & Grains Pvt. Ltd., Unn., (U. P.) Technical Audit of Electrical Installation of 5000 TCD Sugar Factory & 33MW Cogeneration Power Plant including with Dist. Trafo., Conv. Trafo., VFDs, PCCs, MCCs & Cabling, Earthing etc. And 132KV Switchyard
10 Technical Audit of Electrical Installation of 5000 TCD Sugar Factory, 22MW Cogeneration Power Plant with 132KV Switchyard NSL Sugar Ltd., Unit III - Jay Mahesh, Pawarwadi, Tal. Majalgaon, Dist. Beed Technical Audit of Electrical Installation of 5000 TCD Sugar Factory & 22MW Cogeneration Power Plant including with Dist. Trafo., Conv. Trafo., VFDs, PCCs, MCCs & Cabling, Earthing etc. and 132KV Switchyard
11 Study of Lightning Protection System in Unit II & Unit III at Medispray Laboratories Ltd, Kundain, Goa Medispray Laboratories Ltd, Kundain, Goa Study, Evaluation & Recommendations on Lighting Protection System as per IEC Standards.
12 Technical audit Hutatma Swami Warke Sahakari Soot Girni Ltd. Electrical technical audit including plant visit, technical discussion for troubleshooting, providing solution and submission of report.